Nuclear design reports assume best-estimate operating conditions
and cannot be directly adjusted for the as-built, as-operated history
Malfunctioning drives and plugged thimbles may
increase mapping times and impede plant evolutions
Global ramp rates reduce risk of fuel rod clad
ruptures but increase power ascension times
up to
25
days
typical shutdown
schedule uncertainty
up to
3
hours
to take a flux map
OVER
104
hours
typical power ascension time
to 100% power
view solution