Full functional testing leveraging a robust process and a specialized re-fueling testing facility for full mast run outs. Scope ranges from parts replacement to full scale machine builds preventing out of box failures.
Phased approach
1
FACTORY SETUP
PROCEDURE
Factory Setup Procedure
Proven factory setup procedures using best practices/OE ensuring testing matches site installation as close as possible. Continuous improvement/benchmarking other mfg. testing capabilities.
2
FACTORY INITIALIZATION
PROCEDURE
Factory Initialization Procedure
Identifying potential out of the box failures. Systematic approach to electrical verifications to ensure power up of equipment & components. System tuning & calibration takes place during this phase.
3
FACTORY ACCEPTANCE
TESTING
Factory Acceptance Testing
Westinghouse collaborates closely with customers delivering proceduralized testing to ensure customer requirements are met and aligned with industry standards. In addition, components are tested as wholistic system minimizing discovery in the field.
4
SITE INITIALIZATION
PROCEDURE
Site Initialization Procedure
Ensures the machine is ready for acceptance testing validating all machine functions are operating correctly and all boundaries are established.
5
SITE ACCEPTANCE
TESTING
Site Acceptance Testing
Critical Path time is reduced by leveraging the factory acceptance testing ensuring redundant test steps are eliminated. The testing team ensures the machine functions in the intended environment and meets the customer’s requirements.