Development of plant specific operating limits to optimize
power demand match
WESTEMS
TM
enables cyclic fatigue assessments to address
long term flexible power operations
Analysis to address system and component unavailability
Online monitoring of core and control rod limits for
power fluctuations
Electro-thermal energy storage, along with other options
such as hydrogen and chemical production
UP TO
30%
power reduction
resulting from the analysis related to short term FPO periods
up to
60%
reduction in fatigue-inducing stress
can be justified using an automated system for counting transient cycles & monitoring fatigue
up to
30%
power reduction
analyzed for extended reduced power operations (ERPO)
up to
3x
improvement in core power
ramp rate
with BEACON
TM
up to
1
GWh
of stored energy
can be provided
using ETES solutions
Phased Approach
Grid Evolution
nuclear fuel solutions
Please rotate your device.
This site can be viewed in landscape mode on mobile devices or on any computer.