Critical path time saving opportunities using RhoPRO

Simplified operation and training requirements

Small footprint, ease of portability, simplified connections

Ensuring reliability and outage predictability

Demonstrated reliability and outage predictability

up to
10 hours
in time savings from reactor criticality to turnover-to-operations using DRWM  (compared to rod swap)
up to
12 I&C hours
reduction in labor by eliminating disconnection, reconnection of the Power Range detectors
up to
80%
reduction in footprint within the control room compared to ADRC system
LESSONS FROM over
460
Implementations of DRWM
methodology have been integrated into the RhoPRO design
over
20
tests-of-record and
demonstrations using RhoPRO
since initial deployment in 2017

Please rotate your device.

This site can be viewed in landscape mode on mobile devices or on any computer.