Code Compliance & Fire Hazard Assessment
Canadian Nuclear Laboratories (CNL)
Westinghouse performed a CCR for the Solidification Process Facility, at CNL’s Whiteshell Laboratories site. Westinghouse reviewed designs to ensure that the facility aligned with construction and operational codes and standards, as well as completed a Fire Hazard Assessment. Scope included determining the adequacy of the fire protection measures, identifying plausible fire scenarios, verifying that loss limiting criteria were not exceeded, identifying where fire hazards exist, and providing cost effective recommendations to mitigate the identified hazards.