Chalk River Fire Protection Program Review and 2030 Vision
Canadian Nuclear Laboratories (CNL)
Westinghouse’s experts performed an evaluation of CNL’s FPP in consideration of industry best practices. Our experts developed a risk-based fire protection services model that addresses the existing and forecasted site fire risk profile. The developed model allows CNL to perform live assessments of fire protection goals and objectives for their site. The model allows CNL to evaluate fire resource needs (e.g. fire protection systems, fire brigade, etc.) as the site changes. This tool prompts cost savings while maintaining regulatory requirements.